First Australian Supply-class AOR launched in Spain

Authorities

The first of a new class of Royal Australian Navy’s auxiliary oiler replenishment (AOR) ships, the future HMAS Supply, was launched by Spanish shipbuilder Navantia at its Ferrol shipyard on November 23.

Photo: Navantia

HMAS Supply (II) was launched following a keel laying ceremony in November 2017.

Supply and sister ship Stalwart (III) will replace HMAS Success and Sirius with delivery of the first ship scheduled for 2021.

The new Australian AORs are built under a contract signed in May 2016 and are based on the Spanish Navy’s Cantabria-class AORs. They will be delivered at an estimated cost of AU$640 million.

The ships are intended to carry fuel, dry cargo, water, food, ammunition, equipment and spare parts to provide operational support for the deployed naval or combat forces operating far from the port on the high seas for longer periods.

In addition to replenishment, the vessels can be used to combat against environmental pollution at sea, provide logistics support for the armed forces, and to support humanitarian and disaster relief (HADR) operations following a natural disaster.

The AORs will displace 19,500 tons and measure 173.9 meters in length.