Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›US Navy selects Austal USA for USS Oakland maintenance
Shipbuilding

September 17, 2026 · 1 hour ago

US Navy selects Austal USA for USS Oakland maintenance

FB

Fatima Bahtic

Naval Today

2 minutes read
  • LinkedIn
  • X
  • Email
Austal USA
Credit: Austal USA

Austal USA has received a contract, valued at $10.8 million, awarded by the US Navy for emergent maintenance drydocking availability of USS Oakland (LCS 24).

This contract calls for Austal USA’s repair and services team to replace the ship’s main service diesel generator.  To perform the contract, Austal USA will use its newly certified floating dry dock, located at Austal USA’s San Diego waterfront ship repair facility. 

The dry dock has a 9,000 light ton lifting capacity. It is 531 feet (162 meters) long and 154 feet (47 meters) wide, with a wingwall width of 13.12 feet (4.0 meters) and a maximum draft of 36 feet (11 meters). The dry dock cranes have a combined lifting capacity of 16 metric tons.

"This contract award is a significant milestone for Austal USA and a testament to the hard work and dedication of our team in achieving dry dock certification,” said Austal USA President Gene Miller.

“Now we have the capability to provide full-service dry-dock support for extended, year-long repairs. An additional dry dock in San Diego gives the Navy greater capacity to complete complex maintenance projects and emergent repairs in a dedicated dry-dock facility. This is exactly the type of work we built this facility for, and we look forward to demonstrating the exceptional quality and efficiency that our customers have come to expect from Austal USA."

According to Austal USA, the project requires critical work below the waterline, making the new dry dock essential to its successful completion. Performing the work in a dry dock, rather than pierside, is expected to improve efficiency and help return the ship to the fleet as quickly as possible and in peak operating condition.

Related Articles

Vessels

Austal kicks off construction of US Navy’s AFDM

1 min read

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ShipbuildingAmphibious & Support Ships

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Indra unveils new cruise missile designed for mass attacks
  2. 2US Navy selects Austal USA for USS Oakland maintenance
  3. 3MARTAC to expand Devil Ray USV production with Florida boatbuilder
  4. 4Germany lays keel for third Type 424 vessel, sets sights on fourth ship

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free