Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Vessels›Seaspan to build new polar icebreaker for Canadian Coast Guard
Seaspan

Canadian shipbuilder Seaspan Shipyards has been awarded the construction contract to build one of the Canadian Coast Guard’s (CCG) new heavy polar icebreakers.

The polar icebreaker will be built entirely in Canada at Seaspan’s Vancouver Shipyards, located in North Vancouver, British Columbia.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Indian Navy commissions second Mahe-class ASW-SWC
Amphibious & Support Ships

Indian Navy commissions second Mahe-class ASW-SWC

4 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Indian Navy commissions second Mahe-class ASW-SWC
Amphibious & Support Ships

Indian Navy commissions second Mahe-class ASW-SWC

4 days ago

With the contract now in place, Seaspan is ready to cut steel on this ship and begin full-rate construction on Canada’s newest vessel under the National Shipbuilding Strategy (NSS).

The new polar icebreaker will be the seventh vessel designed and built by Seaspan under the NSS. It will also be the fifth Polar-class vessel to be built for the CCG and one of up to 21 icebreaking vessels overall that Seaspan is constructing.

Construction of this ship will support the work of a team of more than 1,000 local shipbuilders and a broad Canadian supply chain of over 800 Canadian companies, according to Seaspan.

The functional design of the polar icebreaker was completed in 2024. The polar icebreaker will be 158 meters long and 28 meters wide, with a design displacement of 26,036 tons.

Highlights of key design features include:

Building this “complex and densely outfitted multi-mission” ship will mark the first time a polar icebreaker has been built in Canada in more than 60 years and will have more advanced capabilities than the CCG’s current heavy icebreakers.

Seaspan noted that, once delivered, this made-in-Canada heavy polar icebreaker will be one of the most advanced and capable icebreakers in the entire world.

The official start of construction for this new heavy polar icebreaker is scheduled for April 2025.

“The contract awarded to Seaspan’s Vancouver Shipyards for the build of a new polar icebreaker is a significant step forward for Canada’s economic and natural resource sectors. This advanced vessel will not only ensure safe and efficient navigation in our polar regions but also support the sustainable development of our natural resources. By enhancing our icebreaking capabilities, we are opening new opportunities for economic growth, scientific research and environmental stewardship,” Jonathan Wilkinson , Minister of Energy and Natural Resources and MP for North Vancouver, said.

“The National Shipbuilding Strategy is providing the Canadian Coast Guard with its fleet of the future. The polar icebreaker to be built by Vancouver Shipyards will be able to operate in the Arctic year-round, further bolstering our ability to deliver crucial services to Northern communities and support Canadian sovereignty in the Arctic,” Diane Lebouthillier , Minister of Fisheries, Oceans and the Canadian Coast Guard, added.

To remind, last March, Seaspan was awarded the construction engineering (CE) and long lead items (LLI) contracts for the pre-construction work of the Canadian Coast Guard’s first six multi-purpose vessels (MPVs).

Related Articles

News

Seaspan proceeds with construction of CCG’s multi-purpose vessels

2 min read
Vessels

March 9, 2025 · about 1 year ago

Seaspan to build new polar icebreaker for Canadian Coast Guard

Canadian shipbuilder Seaspan Shipyards has been awarded the construction contract to build one of the Canadian Coast Guard’s (CCG) new heavy polar icebreakers.

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Damen to refit four Royal Bahamas Defence Force vessels
  2. 2OPTICS11 lands Dutch MoD contract for containerized towed array system
  3. 3TKMS and Navantia join hands on submarine projects
  4. 4Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate