Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Vessels›Construction starts on Finnish Navy’s second Squadron 2020 multi-role corvette
Vessels

October 10, 2024 · about 1 year ago

Construction starts on Finnish Navy’s second Squadron 2020 multi-role corvette

The steel-cutting ceremony for Finnish Navy’s second Squadron 2020 multi-role corvette was held at Rauma Marine Constructions (RMC) shipyard on October 9, 2024.

1 minutes read
  • LinkedIn
  • X
  • Email
Construction starts on Finnish Navy’s second Squadron 2020 multi-role corvette
Credit: Rauma Marine Constructions (RMC)

The steel-cutting ceremony for Finnish Navy’s second Squadron 2020 multi-role corvette was held at Rauma Marine Constructions (RMC) shipyard on October 9, 2024.

The ceremony celebrated the start of the construction phase of the multipurpose corvette. Rauma Marine Constructions and its subsidiary RMC Defence are building four Squadron 2020 multi-role (Pohjanmaa-class corvettes). The high-performance vessels are designed to operate in the Baltic Sea year-round in various circumstances ranging from autumn storms to icy and freezing conditions.

The keel-laying ceremony for the first vessel in this class was held in April this year. The construction of the multipurpose corvettes has progressed well, according to RMC, and it is already taking shape.

According to RMC, Pohjanmaa-class corvettes are equipped with monitoring capacities for air, surface and underwater surveillance. The 117-meter-long vessels are designed to operate in the Baltic Sea year-round in various circumstances, including also icy and freezing conditions. They have a width of 16 meters, a draft of 5 meters, and are capable of traveling at 26 knots.

They are also capable of laying navy mines, performing defense actions against surface vessels, submarines and various airborne targets and conducting maritime operations. In addition to domestic operations, the vessels can be used in crisis management measures and as part of NATO’s Standing Naval Forces.

The entire project is scheduled for completion to be completed in 2029.

Related Articles

Vessels

Keel laid for Finnish Navy’s first Squadron 2020 multi-role corvette

2 min read

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1France takes over command of NATO security task force in Northern European waters
  2. 2Babcock strengthens UK-Danish naval partnerships
  3. 3Amentum joint venture joins Australia nuclear submarine shipyard project
  4. 4Rheinmetall to supply Danish Armed Forces with MASS decoy system

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free