Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Authorities›GD Electric Boat gets $251M in contracts for US Navy submarine work
Authorities

October 12, 2020 · about 6 years ago

GD Electric Boat gets $251M in contracts for US Navy submarine work

The US Navy recently awarded General Dynamics Electric Boat (GDEB) two contracts for fleet maintenance support as well as for Virginia-class sub development and design work.

2 minutes read
  • LinkedIn
  • X
  • Email
electric boat
Illustration. Photo: US Navy/General Dynamics Electric Boat

The US Navy recently awarded General Dynamics Electric Boat (GDEB) two contracts for fleet maintenance support as well as for Virginia-class sub development and design work.

As informed, the contracts have a total value of $251 million.

The first contract is a $215.7 million modification to a previously awarded contract, the cumulative value of which, if all options are exercised, could be more than $1 billion. Electric Boat will provide planning yard, design agent, engineering services and technical support for in-service submarines and submersible systems.

Work will be performed in Groton, Connecticut (70%); Kings Bay, Georgia (13%); Bangor, Washington (10%); Pearl Harbor, Hawaii (3%); North Kingston, Rhode Island (2%); and Newport, Rhode Island (2%), and is expected to be completed by September 2023.

The second contract is a $35.3 million cost-plus-fixed-fee contract for Reactor Plant Planning Yard services for the submarine fleet and Support Yard services for the navy’s moored training ships.

According to the navy, work will be performed in Newport News, Virginia (90%); Kings Bay, Georgia (3%); Bremerton, Washington (2%); Pearl Harbor, Hawaii (2%); Kittery, Maine (2%); and Groton, Connecticut (1%), and is expected to be completed by September 2022. If all options are exercised, work will be completed by September 2024.

“We continue to work to hire, train and develop future generations of shipbuilders as we continue to deliver the Virginia class of fast attack submarines and move toward full-scale construction of the Columbia class of ballistic missile submarines,” Kevin Graney , President, General Dynamics Electric Boat, said.

Related Articles

General Dynamics gets $22.2 bn contract for US Navy’s Virginia-class submarines
Submarines

General Dynamics gets $22.2 bn contract for US Navy’s Virginia-class submarines

2 min read

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

AuthoritiesIndustry

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Leonardo to provide electric propulsion systems for ROKN's KDDX destroyers
  2. 2Navantia launches Spanish Navy’s submarine intervention vessel (VIDEO)
  3. 3US Navy orders additional Hammerhead anti-submarine mine systems
  4. 4TKMS ATLAS UK wins UK contract for submarine torpedo defense system

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free