Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Amphibious & Support Ships›MAN to power Canada’s Joint Support Ships
Amphibious & Support Ships

April 4, 2019 · about 7 years ago

MAN to power Canada’s Joint Support Ships

Canadian shipbuilder Seaspan Shipyards has awarded MAN Energy Solutions Canada a CAD 55 million contract to provide essential power generation and propulsion systems for the Royal Canadian Navy’s new Joint Support Ships. Propulsion and power generation components will include two MAN 12V32/44CR (Com

1 minutes read
  • LinkedIn
  • X
  • Email

Canadian shipbuilder Seaspan Shipyards has awarded MAN Energy Solutions Canada a CAD 55 million contract to provide essential power generation and propulsion systems for the Royal Canadian Navy’s new Joint Support Ships.

Propulsion and power generation components will include two MAN 12V32/44CR (Common Rail) propulsion engines equipped with environmental protection SCR technology, reduction gears, propulsion shafts, propellers, ship service diesel generator sets, and an emergency diesel generator set.

Work on these components will take place in Europe at MAN’s established manufacturing facilities. Work taking place in Canada will include MAN providing the integration for these systems, training, testing, and support during the harbor acceptance trials and the sea acceptance trials.

The two Joint Support Ships (JSS) are being built to replace the former Auxiliary Oiler Replenishment vessels.

In June 2018, Seaspan started building JSS blocks to bridge a gap in employment as current works on three Canadian Coast Guard fisheries vessels will be completed before the design for a new coast guard ocean science ship is ready.

The first JSS is scheduled for delivery in 2022/23, and the second in 2023/24.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Amphibious & Support ShipsVesselsEquipment & technologyPropulsion

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Angolan Navy receives six HT-100 NAVAL unmanned helicopters
  2. 2Bangladesh Coast Guard taps MAURIC for five patrol vessels
  3. 3US Navy's USV hit in Strait of Hormuz, Iran reports
  4. 4French Navy receives two Falcon 2000LXS Albatros aircraft

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free