Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Construction starts on first US Coast Guard offshore patrol cutter

Construction on the first ship in a new class of US Coast Guard cutters started with a steel cutting ceremony at Eastern Shipbuilding Group’s facilities in Panama City, Florida, on January 7.

The steel cutting for offshore patrol cutter (OPC) Argus (WMSM-915) was a significant milestone for the company even after it sustained damage and work interruption due to Hurricane Michael.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAmphibious & Support ShipsAviation

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago

The cutting of steel will start the fabrication and assembly of the cutter’s hull, and ESG is to complete keel laying of Argus later this year.

Additionally, ESG completed the placement of orders for all long lead time materials for the second cutter, Chase (WMSM-916).

“Today represents a monumental day and reflects the dedication of our workforce – the ability to overcome and perform even under the most strenuous circumstances and impacts of Hurricane Michael,” Eastern’s president Joey D’Isernia said. “Today’s success is just the beginning of the construction of the OPCs at ESG by our dedicated team of shipbuilders and subcontractors for our customer and partner, the United States Coast Guard. We are excited for what will be a great 2019 for Eastern Shipbuilding Group and Bay County, Florida.”

Measuring 360 feet in length and 54 feet in width, with a projected speed of 22 knots, the OPCs are designed to conduct multiple missions in support of the nation’s maritime security and border protection.

Also referred to as the Heritage-class, the OPCs will provide a capability bridge between the national security cutter, which patrols the open ocean in the most demanding maritime environments, and the fast response cutter, which serves closer to shore.

The cutter design includes the capability of carrying an MH-60R or MH-65 helicopter and three operational over the-horizon small boats.

Eastern Shipbuilding Group will construct the OPCs to replace the medium endurance cutters currently in service. The contract includes options for production of up to nine vessels with options for two additional vessels.

The Coast Guard plans to acquire a total of 25 OPCs.

The first 11 cutters that are set to start deliveries in fiscal year 2021 will be named Argus, Chase, Ingham, Pickering, Rush, Icarus, Active, Diligence, Alert, Vigilant and Reliance.

Surface Vessels

January 29, 2019 · about 7 years ago

Construction starts on first US Coast Guard offshore patrol cutter

Construction on the first ship in a new class of US Coast Guard cutters started with a steel cutting ceremony at Eastern Shipbuilding Group’s facilities in Panama City, Florida, on January 7. The steel cutting for offshore patrol cutter (OPC) Argus (WMSM-915) was a significant milestone for the comp

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Damen to refit four Royal Bahamas Defence Force vessels
  2. 2OPTICS11 lands Dutch MoD contract for containerized towed array system
  3. 3TKMS and Navantia join hands on submarine projects
  4. 4Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate