Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Canadian Navy’s first AOPS HMCS Harry DeWolf takes shape
Surface Vessels

December 8, 2017 · about 8 years ago

Canadian Navy’s first AOPS HMCS Harry DeWolf takes shape

Irving Shipbuilding has transported the last major section of the Royal Canadian Navy’s first Arctic and Offshore Patrol Ship – the future HMCS Harry DeWolf – from inside the Halifax Shipyard’s indoor shipbuilding facility outside to land level. As the bow section was joined together with the previo

1 minutes read
  • LinkedIn
  • X
  • Email

Irving Shipbuilding has transported the last major section of the Royal Canadian Navy’s first Arctic and Offshore Patrol Ship – the future HMCS Harry DeWolf – from inside the Halifax Shipyard’s indoor shipbuilding facility outside to land level.

As the bow section was joined together with the previously connected center- and stern sections, the HMCS Harry DeWolf assumed the form of a fully assembled ship.

Further outfitting will continue at land level and the ship is expected to be ready for launch in summer 2018.

Construction of HMCS Harry DeWolf began in September 2015. Over the course of time, 65 smaller units became 21 larger blocks, which then became three mega-blocks.

The 103-meter ship will displace 6,440 tonnes and carry a crew of up to 65 people, plus an additional 22 to support an enhanced naval boarding party, army troops, special operations forces and other government departments to support science and research.

Construction on the second ship in the class, HMCS Margaret Brooke, started in May, 2017 with a naming/launching ceremony set for 2019.

HMCS Harry DeWolf and HMCS Margaret Brooke are the first two of an initial block of six vessels ordered by the RCN under a CAD$2.3 billion contract in January 2015.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsCapital InvestmentsAmphibious & Support ShipsResearch & DevelopmentResearch & Innovation

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Manned P-8A Poseidon and unmanned MQ-4C Triton team up in new demo
  2. 2Royal Navy tests drone armada concept
  3. 3CBO: US Navy’s Trump-class battleship program could cost $275B
  4. 4HII, HD Hyundai bring intelligent welding to Ingalls shipyard

Related articles

Pohjanmaa class corvette
Surface Vessels

Keel laid for Finnish Navy's fourth Pohjanmaa-class corvette

1 day ago

Arleigh Burke class destroyer
Vessels

US Navy's newest guided missile destroyer christened

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Pohjanmaa class corvette
Surface Vessels

Keel laid for Finnish Navy's fourth Pohjanmaa-class corvette

1 day ago
Arleigh Burke class destroyer
Vessels

US Navy's newest guided missile destroyer christened

1 day ago