Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Defense Strategies›Royal Netherlands Navy first to install USCG approved BWT system
Defense Strategies

July 5, 2017 · about 9 years ago

Royal Netherlands Navy first to install USCG approved BWT system

The Royal Netherlands Navy has achieved the distinction of becoming the world’s first Navy to install a USCG approved ballast water treatment (BWT) system, fitting two Optimarin units on-board the Landing Platform Docking vessel Zr.Ms. Johan de Witt. Global engineering specialist Goltens Green Techn

3 minutes read
  • LinkedIn
  • X
  • Email

The Royal Netherlands Navy has achieved the distinction of becoming the world’s first Navy to install a USCG approved ballast water treatment (BWT) system, fitting two Optimarin units on-board the Landing Platform Docking vessel Zr.Ms. Johan de Witt.

Global engineering specialist Goltens Green Technologies completed the installation at the Navy Yard in Den Helder last month. The project is part of a ten-vessel agreement between Goltens and the Navy, which will see turnkey installations of the Optimarin Ballast System (OBS) across a selection of advanced, specialist ships. OBS became the first BWT system to achieve full USCG approval in December last year.

“This was both a complex and landmark project for us and our partners,” comments Maarten Romijn, Project Manager, Goltens .

“Space on this vessel was at a premium, so, after thorough 3D scanning, we exploited the modular nature of the Optimarin system to plan for an optimal installation, before starting pre-fabrication of the piping and electrical components.”

“We then made a large transport opening in the ship’s hull to move the system and all related parts into the pump room. As such the project wasn’t straightforward, but by drawing on our expertise, and working in close collaboration with the Navy and Optimarin, it was completed within the maintenance period of the vessel.”

“We’re now looking ahead to the next conversions, and building our strong working relationship with Optimarin.”

Roy van Kruisbergen, Project Manager, Royal Netherlands Navy : “We’re focused on optimising both the flexibility of our fleet and their environmental performance. We now have a BWT system that meets the Royal Netherlands Navy demands. We look forward to emulating the success of this project on upcoming installations.”

Goltens fitted two OBS units on the 28,395 GT, 176m long vessel, with one 1500m³/h system and one 500m³/h unit. Boasting a combination of automatic back flushing, self-cleaning filters (Boll & Kirch) and powerful 35 kW UV lamps, the systems have the capacity to neutralise all potentially invasive species in ballast water. Alongside USCG compliance the OBS also has full IMO approval and certification from DNV GL, Lloyd’s, Bureau Veritas, MLIT Japan, and American Bureau of Shipping.

“Gaining USCG approval was a milestone for this business, and the wider industry,” remarks Optimarin CEO Tore Andersen , “and it’s another significant step to complete the first installation after that development. That it’s with a customer of the standing of the Royal Netherlands Navy makes it even more special.

“Together with Goltens we have unparalleled expertise in retrofitting BWT systems, ensuring that we can find solutions for every individual shipowner, and vessel. Working as a partnership we aim to give our customers exactly what they need – simple, reliable, easy to install, and 100% globally compliant systems. With complete peace of mind and operational flexibility as standard.”

Goltens and Optimarin have retrofitted OBS units on around 100 vessels globally. In total, Optimarin has now sold more than 500 OBS systems, with over 300 installed and operational worldwide.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Defense StrategiesAuthoritiesLaws and Regulations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Damen to refit four Royal Bahamas Defence Force vessels
  2. 2OPTICS11 lands Dutch MoD contract for containerized towed array system
  3. 3TKMS and Navantia join hands on submarine projects
  4. 4Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

Related articles

US Navy awards $2.2B contract to speed delivery of new medium landing ships
Amphibious & Support Ships

US Navy awards $2.2B contract to speed delivery of new medium landing ships

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

US Navy awards $2.2B contract to speed delivery of new medium landing ships
Amphibious & Support Ships

US Navy awards $2.2B contract to speed delivery of new medium landing ships

12 days ago