Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›US Navy sets commissioning date for Gerald R. Ford (CVN 78)
Surface Vessels

June 19, 2017 · about 9 years ago

US Navy sets commissioning date for Gerald R. Ford (CVN 78)

The U.S. Navy’s newest aircraft carrier, future USS Gerald R. Ford (CVN 78), is set to be commissioned during a ceremony that will be held at Naval Station Norfolk on July 22. CVN 78 is the first new U.S. aircraft carrier design in 40 years. Despite of challenges presented by integrating a multitude

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Navy’s newest aircraft carrier, future USS Gerald R. Ford (CVN 78), is set to be commissioned during a ceremony that will be held at Naval Station Norfolk on July 22.

CVN 78 is the first new U.S. aircraft carrier design in 40 years.

Despite of challenges presented by integrating a multitude of new technologies in a first-of-class ship, Gerald R. Ford will be joining the navy with electromagnetic catapults, replacing steam-powered systems found on the Nimitz-class ships.

The ship will also feature a new Advanced Arresting Gear system, and will have 250 percent more electrical power to support future technologies. It will additionally be operating with 400 fewer crew members.

CVN 78 was ordered from Newport News Shipbuilding, a subsidiary of Huntington Ingalls Industries, on Sept. 10, 2008 while the keel laying ceremony took place on November 13, 2009.

The aircraft carrier was launched on October 11, 2013, and after several delays started sea trials in April 2017.

The ships passed the U.S. Navy’s Board of Inspection and Survey (INSURV) late May.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAmphibious & Support ShipsOperations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Navy retires Freedom-variant LCS USS Fort Worth
  2. 2UK funds next Dreadnought-class submarine phase with £8.4B package
  3. 3L3Harris to supply battery monitoring systems for US Navy Virginia and Columbia-class subs
  4. 4Rheinmetall to modernize F123-class frigate for German Navy

Related articles

F123 frigate
Vessels

Rheinmetall to modernize F123-class frigate for German Navy

22 hours ago

Mogami frigate australia
Surface Vessels

Japan’s OKI to supply towed passive sonar for Australia’s Mogami-based frigate fleet

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

F123 frigate
Vessels

Rheinmetall to modernize F123-class frigate for German Navy

22 hours ago
Mogami frigate australia
Surface Vessels

Japan’s OKI to supply towed passive sonar for Australia’s Mogami-based frigate fleet

1 day ago