Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USS Detroit completes final contract trials
Surface Vessels

May 21, 2017 · about 9 years ago

USS Detroit completes final contract trials

The U.S. Navy’s Freedom-class littoral combat ship USS Detroit (LCS 7), completed final contract trials (FCT) during a five-day evaluation period that began May 10. The trials, conducted by the Navy’s Board of Inspection and Survey, are part of a series of post-delivery test and trial events through

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Navy’s Freedom-class littoral combat ship USS Detroit (LCS 7), completed final contract trials (FCT) during a five-day evaluation period that began May 10.

The trials, conducted by the Navy’s Board of Inspection and Survey, are part of a series of post-delivery test and trial events through which the ship and its major systems are exercised.

The trials began with pre-underway and material condition checks followed by at-sea demonstrations. Trial highlights included combat systems air and surface detect-to-engage scenarios, 57mm gun firing exercises, maneuvering testing and the launch/recovery of an 11-meter, rigid hull inflatable boat using the launch handling and recovery system.

“After a highly successful exchange of command and several weeks of preparation, seeing the Final Contract Trials executed as a team was incredible,” said Cmdr. David Adams , Detroit’s commanding officer. “A lot of people came together from my crew, off hull crews, LCSRON 2, PMS 501, and Lockheed Martin to make the FCT happen. Now that it’s over, we can’t wait to continue Detroit’s Combat System Ship Qualification Trails to showcase our amazing ship.”

Several government and private agencies supported the trials, led by the LCS program office and included industry partner Lockheed Martin and Southeast Regional Maintenance Center. FCT is conducted prior to the end of the guarantee period to determine if there are any defects, failures or deterioration other than that due to normal wear and tear.

Constructed by Lockheed Martin in Marinette, Wisconsin, Detroit is the fourth Freedom variant LCS. She was christened Oct. 18, 2014, and commissioned Oct. 22, 2016, in Marinette. On Dec. 31, 2016, Detroit was homeport shifted to Mayport from San Diego.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologyOperationsSensors & Combat Systems

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

OPTICS11
Sensors & Combat Systems

OPTICS11 lands Dutch MoD contract for containerized towed array system

1 day ago

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OPTICS11
Sensors & Combat Systems

OPTICS11 lands Dutch MoD contract for containerized towed array system

1 day ago
Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago