Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Keel laid for first Italian Navy Multipurpose Offshore Patrol Ship
Surface Vessels

May 9, 2017 · about 9 years ago

Keel laid for first Italian Navy Multipurpose Offshore Patrol Ship

Italian shipbuilder Fincantieri laid the keel for the Italian Navy’s first Multipurpose Offshore Patrol Ship (PPA) on May 9. The ceremony took place at Fincantieri’s shipyard in Muggiano, La Spezia. According to Fincantieri, the first of seven offshore patrol ships will be delivered in 2021. The PPA

1 minutes read
  • LinkedIn
  • X
  • Email

Italian shipbuilder Fincantieri laid the keel for the Italian Navy’s first Multipurpose Offshore Patrol Ship (PPA) on May 9.

The ceremony took place at Fincantieri’s shipyard in Muggiano, La Spezia.

According to Fincantieri, the first of seven offshore patrol ships will be delivered in 2021. The PPA vessels are part of the Italian Navy’s fleet renewal plan, approved by the government and parliament and started in May 2015.

The project as a whole involves the construction of nine units, including seven PPAs, one multipurpose amphibious unit (LHD or Landing Helicopter Dock), and one logistic support unit (LSS or Logistic Support Ship).

The 132.5-meter multipurpose offshore patrol vessels will serve multiple functions, ranging from patrol with sea rescue capacity to civil protection operations and, in their most highly equipped version, first line fighting vessel.

According to Fincantieri, PPAs will have different configurations of the combat system: starting from a “soft” version for the patrol task, integrated for self-defence ability, to a “full” one, equipped for a complete defence ability.

The vessels will be crewed by 171 servicemen and, propelled by a combined diesel, a gas turbine plant (CODAG) and an electric propulsion system, they will be capable of reaching speeds of over 33 knots. RHIBS up to 11 meter in length will be deployed through lateral cranes or a hauling ramp located at the far stern.

Fincantieri expects to deliver the final PPA vessel by 2026.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAuthoritiesEquipment & technologyDefense StrategiesAmphibious & Support ShipsAviationSensors & Combat SystemsPropulsion

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Steel cut for Indonesia’s first Scorpène submarine
  2. 2US Coast Guard explores laser weapons against drones and USVs
  3. 3HII to award up to $900M in shipbuilding work to robotics firms
  4. 4US Navy trials Lockheed Martin's AI-powered sub hunter

Related articles

ASW
Equipment & technology

US Navy trials Lockheed Martin's AI-powered sub hunter

13 hours ago

P8 Triton
Aviation

Manned P-8A Poseidon and unmanned MQ-4C Triton team up in new demo

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

ASW
Equipment & technology

US Navy trials Lockheed Martin's AI-powered sub hunter

13 hours ago
P8 Triton
Aviation

Manned P-8A Poseidon and unmanned MQ-4C Triton team up in new demo

1 day ago