Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USS Gerald R. Ford starts preparations for acceptance trials
Surface Vessels

April 16, 2017 · about 9 years ago

USS Gerald R. Ford starts preparations for acceptance trials

The lead ship of the next generation of U.S. Navy aircraft carriers, the future USS Gerald R. Ford (CVN 78), has completed builder’s sea trials and is now starting preparations for the acceptance trials. The aircraft carrier returned to Naval Station Norfolk, Virginia on April 14 after seven days of

1 minutes read
  • LinkedIn
  • X
  • Email

The lead ship of the next generation of U.S. Navy aircraft carriers, the future USS Gerald R. Ford (CVN 78), has completed builder’s sea trials and is now starting preparations for the acceptance trials.

The aircraft carrier returned to Naval Station Norfolk, Virginia on April 14 after seven days of builder’s sea trials.

During this initial at-sea period, Ford’s crew, representatives from Huntington Ingalls Industries-Newport News Shipbuilding, the Navy’s CVN 78 Program Office, the Navy’s Supervisor of Shipbuilding, Conversion and Repair and various technical subject matter experts demonstrated many of the ship’s capabilities including tracking aircraft using the Dual Band Radar, conducting “no load” cycles using the new electromagnetic aircraft launch system (EMALS) and small boat operations.

As is typical with sea trials, the Navy and shipbuilder learned a great deal about the ship’s performance during the extensive testing. Analysis continues, and any identified corrective actions will be addressed.

The U.S. Navy said the CVN 78 remains on track to conduct acceptance trials and delivery to the Navy this spring.

The Huntington Ingalls Industries- built ship is 1,100 foot (335 meter) long and displaces 100,000 tonnes. Ordered on September 10, 2008, USS Gerald R. Ford is the most expensive ship in the Navy’s fleet with a price tag of $12.9 billion.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologySensors & Combat Systems

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

OPTICS11
Sensors & Combat Systems

OPTICS11 lands Dutch MoD contract for containerized towed array system

1 day ago

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OPTICS11
Sensors & Combat Systems

OPTICS11 lands Dutch MoD contract for containerized towed array system

1 day ago
Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago