Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Video: Second Ford-class carrier takes shape with new superlift
Surface Vessels

January 24, 2017 · about 9 years ago

Video: Second Ford-class carrier takes shape with new superlift

U.S. Navy’s aircraft carrier builder Huntington Ingalls Industries announced it has lifted a 704-metric ton unit into Dry Dock 12, where the aircraft carrier John F. Kennedy (CVN 79) is taking shape. The superlift is part of an improved build strategy implemented on the second ship of the Gerald R.

2 minutes read
  • LinkedIn
  • X
  • Email

U.S. Navy’s aircraft carrier builder Huntington Ingalls Industries announced it has lifted a 704-metric ton unit into Dry Dock 12, where the aircraft carrier John F. Kennedy (CVN 79) is taking shape.

The superlift is part of an improved build strategy implemented on the second ship of the Gerald R. Ford (CVN 78) class, resulting in superlifts erected at a higher state of outfitting completion.

“For Kennedy, increased pre-outfitting puts into practice one of many lessons learned from Gerald R. Ford,” said Mike Shawcross , Newport News’ vice president, CVN 79 construction. “This superlift will erect the first portion of hangar bay.”

The unit, which has been under construction since August 2015, is made up of 22 smaller units and comprises small equipment and machinery rooms, berthing, and other quality-of-life spaces, such as the barber shop and post office. It measures about 80 feet long and 105 feet wide.

Like Ford, Kennedy is being built using modular construction, a process where smaller sections of the ship are welded together to form large structural units, equipment is installed, and the large units are lifted into the dry dock using the shipyard’s 1,050-metric ton gantry crane.

According to HII, Kennedy is about 25 percent complete. The carrier is on track to be completed with 445 lifts, which is 51 fewer than Ford and 149 less than USS George H.W. Bush (CVN 77), the last Nimitz-class carrier. About 140 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Kennedy is scheduled to be launched in 2020 and deliver to the Navy in 2022, when it will replace USS Nimitz (CVN 68).

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAuthoritiesDefense Strategies

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1MCWL accepts first Ancillary Surface Craft prototype
  2. 2Australia selects site for Henderson Defence Precinct
  3. 3Royal Netherlands Navy opts for Destinus Hornet B2 interceptor
  4. 4Keel laid for Australia's first Hunter class frigate

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free