Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations›Photo: Smallest Royal Navy vessel scans seabed ahead of Queen carrier sea trials
Operations

September 4, 2016 · about 10 years ago

Photo: Smallest Royal Navy vessel scans seabed ahead of Queen carrier sea trials

Nineteen times longer, 15 times wider and a staggering 3,000 times heavier, the new carrier dwarfed the small survey craft HMS Gleaner as she scanned the huge inner basin at Rosyth, where Queen Elizabeth is in the final stages of completion. The smallest vessel in the Royal Navy, previously used to

2 minutes read
  • LinkedIn
  • X
  • Email

Nineteen times longer, 15 times wider and a staggering 3,000 times heavier, the new carrier dwarfed the small survey craft HMS Gleaner as she scanned the huge inner basin at Rosyth, where Queen Elizabeth is in the final stages of completion.

The smallest vessel in the Royal Navy, previously used to scan the wreck of the Mary Rose in the Solent, has spent weeks surveying the Forth estuary to ensure carrier HMS Queen Elizabeth leaves Rosyth dockyard without any obstacles next spring.

According to the Royal Navy, the future flagship is due to begin trials in the North Sea next spring ahead of her debut in her home base of Portsmouth.

But with data on the Forth estuary 60 years old, Plymouth-based Gleaner and a specialist team of military surveyors were dispatched to Scotland to gather information on the tides, river bed and the three crossings – one rail, two road – to ensure the carrier’s first departure runs smoothly.

HMS Queen Elizabeth has already been fitted with a special main mast which can be lowered to allow the ship to safely pass beneath the bridges.

But taking nothing to chance, Army surveyors from 42 Engineer Regiment (Geographic) from RAF Wyton in Cambridgeshire used the latest theodolites to measure the bridge heights, while Gleaner’s crew did the same using a new laser scanner.

Beneath the surface, Gleaner’s sonar looked down at the main channel into Rosyth dockyard which will need dredging before the carrier sails, and scanned the inner basin itself – 11.8 metres deep and about 32 times the size of the pitch at Wembley.

“The use of modern multibeam sonar and precise satellite positioning should make the survey straightforward, but the environment of an estuary rarely makes it that way,” said the launch’s Commanding Officer Lt Marc Taylor .

“Still, we’ve finished the job and shown how the Royal Navy’s smallest ship can provide a vital service to its largest.”

Queen Elizabeth’s first Commanding Officer Capt Jerry Kyd took the helm of Gleaner for some of the work inside the basin to see the accuracy of the data being collected for himself.

“The excellent work carried out by Gleaner over the past few months is hugely important to me as Queen Elizabeth’s captain,” he said.

“ There’s an absolute need to understand the hydrographical issues that will impact on the safe navigation of the carrier when we sail from Rosyth next spring.”

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

OperationsEquipment & technologyWeapons SystemsSensors & Combat Systems

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1UK funds next Dreadnought-class submarine phase with £8.4B package
  2. 2L3Harris to supply battery monitoring systems for US Navy Virginia and Columbia-class subs
  3. 3Rheinmetall to modernize F123-class frigate for German Navy
  4. 4US Navy awards $76.6B for Virginia and Columbia submarine construction

Related articles

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

7 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

7 days ago