Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USS Fort Worth Ends First Maintenance in Sembawang
Surface Vessels

September 22, 2015 · about 11 years ago

USS Fort Worth Ends First Maintenance in Sembawang

The littoral combat ship USS Fort Worth (LCS 3) is making preparations to get underway from Sembawang after successfully conducting preventive maintenance availability (PMAV) and restricted availability (RAV) maintenance. This availability was particularly unique, as it was the first maintenance ava

1 minutes read
  • LinkedIn
  • X
  • Email

The littoral combat ship USS Fort Worth (LCS 3) is making preparations to get underway from Sembawang after successfully conducting preventive maintenance availability (PMAV) and restricted availability (RAV) maintenance.

This availability was particularly unique, as it was the first maintenance availability conducted at Sembawang. Typically Fort Worth will conduct maintenance availabilities at Changi Naval Base, but the ability to shift the location to a different port further demonstrates the flexibility of the ship as well as the shore support, which will be beneficial when more LCSs are operating in the region.

After a scheduled underway period where Fort Worth completed Cooperation Afloat Readiness and Training (CARAT) Indonesia, as well as CARAT Malaysia, the ship was due for an in port maintenance period.

This maintenance period had the added complexity of simultaneously undertaking both restricted availability maintenance and preventive maintenance.

The hundreds of preventive maintenance checks that Crew 102 performed over the maintenance period varied from simple tasks to complicated undertakings.

Fort Worth is the second LCS to deploy to U.S. 7th Fleet as part of an initiative to simultaneously deploy up to four LCS to the Indo-Asia-Pacific region in just a few years. The third and fourth LCSs are planned to arrive in 2016, when the region will see two of these ships deployed at the same time.

[mappress mapid=”16988″]

Image: US Navy

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAmphibious & Support Ships

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saronic puts first Marauder MUSV through testing at Port of Gulfport
  2. 2Raytheon and CET unveil Hadalus UUV
  3. 3Germany, Norway and Canada start preparations for Type 212CD sub contract
  4. 4OCCAR signs contract amendment for Horizon frigate mid-life upgrade

Related articles

OCCAR
Surface Vessels

OCCAR signs contract amendment for Horizon frigate mid-life upgrade

1 day ago

Scorpene
Vessels

Steel cut for Indonesia’s first Scorpène submarine

4 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OCCAR
Surface Vessels

OCCAR signs contract amendment for Horizon frigate mid-life upgrade

1 day ago
Scorpene
Vessels

Steel cut for Indonesia’s first Scorpène submarine

4 days ago