Naval Shipyard Gdynia Finishes Overhaul of Warship ORP Baltyk

Naval Shipyard Gdynia S.A. has completed the overhaul of the warship ORP Bałtyk (fuel tanker with the ship’s side number Z-1).

The scope of overhaul included among other things: maintenance of the hull, superstructure, open decks and tanks. Furthermore, the shipyard carried out repairs of the main cooling water over-board system and bottom-side fittings, as well as repair of tail shafts along with adjustable propellers

Besides the above, scope of the works also included repair of the thruster, rudder’s set along with steering gear and cathodic protection system as well as survey of log and echo sounder.

[mappress]
Press Release, November 25, 2013