Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USS Gerald R. Ford Undergoes Finishing Touches
Surface Vessels

November 19, 2013 · about 13 years ago

USS Gerald R. Ford Undergoes Finishing Touches

Huntington Ingalls Industries’ Newport News Shipbuilding (NNS) division launched Gerald R. Ford (CVN 78) into the James River for the first time on Sunday. The first-of-class aircraft carrier was moved to the shipyard’s Pier 3, where it will undergo additional outfitting and testing for the next 28

1 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries’ Newport News Shipbuilding (NNS) division launched Gerald R. Ford (CVN 78) into the James River for the first time on Sunday. The first-of-class aircraft carrier was moved to the shipyard’s Pier 3, where it will undergo additional outfitting and testing for the next 28 months.

Gerald R. Ford has been under construction in Dry Dock 12 since November 2009 and was moved about one mile south to the shipyard’s Pier 3 with the assistance of six tugboats. The ship will be moored at Pier 3 to complete outfitting and testing. Habitability spaces, such as berthing and mess areas, will be completed, and distributive, mechanical and combat systems, such as catapults and radar arrays, will be tested. The ship is scheduled for delivery to the U.S. Navy in 2016.

“The ship’s launch is always significant for her shipbuilders,” said NNS Rolf Bartschi, NNS’ vice president of CVN 78 carrier construction, “but I think it’s an extra special experience this time because of Ford’s unique qualities as the first ship of the class, and thanks to the close relationship shipbuilders have developed with CVN 78’s sponsor, Susan Ford Bales. This milestone provides an opportunity for the shipbuilding team to reflect on all of the hard work that has been accomplished to ready the ship for launch, and I could not be more proud of our shipbuilding team.”

[mappress] Press Release, November 20, 2013; Image: Navy

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologySensors & Combat Systems

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Navy moves Blackbeard hypersonic weapon into production
  2. 2Boeing gets $562M US Navy contract for three MQ-25A Stingrays
  3. 3Montenegro launches new patrol vessel in France
  4. 4Quantum Systems introduces Seavex USV and Subvex UUV

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free