Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USA: Ingalls Shipbuilding Delivers Composite Hangar for Future Michael Monsoor
Surface Vessels

September 26, 2013 · about 13 years ago

USA: Ingalls Shipbuilding Delivers Composite Hangar for Future Michael Monsoor

Ingalls Shipbuilding division of Huntington Ingalls Industries (HII) has delivered the composite hangar that will be used on the U.S. Navy’s second Zumwalt-class guided missile destroyer, Michael Monsoor (DDG 1001), HII announced. “Our shipbuilders’ performance on this hangar composite construction

1 minutes read
  • LinkedIn
  • X
  • Email

Ingalls Shipbuilding division of Huntington Ingalls Industries (HII) has delivered the composite hangar that will be used on the U.S. Navy’s second Zumwalt-class guided missile destroyer, Michael Monsoor (DDG 1001), HII announced.

“Our shipbuilders’ performance on this hangar composite construction has allowed us to deliver it nine days ahead of the commitment made last year,” said Ingalls’ DDG 1000 Program Manager Steve Sloan. “This construction time is a significant improvement from the first set of class products to the second set. It is a testament to the hard work and excellent logistics and manufacturing processes put in place on this program. A considerable amount of outfitting transpired earlier in the process allowing for the early delivery time.”

The 220-ton structure will be translated to a shipping barge and sent to Maine in early October. Ingalls is building the hangar, peripheral vertical launch system (PVLS) and composite deckhouse for Michael Monsoor. The PVLS was delivered in July, and all that remains is the deckhouse delivery expected in first quarter of 2014.

[mappress] Press Release, September 26, 2013; Image: HII

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologyWeapons SystemsAmphibious & Support Ships

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First forward-deployed Virginia-class sub completes Pacific mission
  2. 2Italian Navy's second next-gen minehunter reaches construction milestone
  3. 3Indian Navy launches seventh ASW SWC at Cochin Shipyard
  4. 4US Navy retires Freedom-variant LCS USS Fort Worth

Related articles

Intermarine
Shipbuilding

Italian Navy's second next-gen minehunter reaches construction milestone

6 hours ago

ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

7 hours ago

LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

8 hours ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Intermarine
Shipbuilding

Italian Navy's second next-gen minehunter reaches construction milestone

6 hours ago
ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

7 hours ago
LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

8 hours ago