Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USA: NNS Installs Final Aircraft Elevator on Gerald R. Ford
Surface Vessels

August 15, 2013 · about 13 years ago

USA: NNS Installs Final Aircraft Elevator on Gerald R. Ford

Huntington Ingalls Industries announced on August 14 that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78). The elevator, which is used to move aircraft from the hangar bay to the flight deck

1 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries announced on August 14 that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78).

The elevator, which is used to move aircraft from the hangar bay to the flight deck quickly and safely, is located on the starboard side of the ship. It measures 85 feet long and 52 feet wide and weighs 120 tons, akin to a steam locomotive.

“The Ford class is designed with three aircraft elevators, one less than the Nimitz class,” said Rolf Bartschi, NNS vice president, CVN 78 carrier construction. “The design provides greater flight deck area for increased sortie rates over the Nimitz-class design. The location and number of aircraft elevators are an integral part of the design.”

Gerald R. Ford’s primary hull structure reached 100 percent structural completion in May, bringing more than three years of structural erection work to a close. Work continues on the ship, including work on the piping and electrical systems and habitability areas such as the galley and mess spaces. Shipbuilders are also in the process of painting the hull prior to the ship’s christening, scheduled for Nov. 9.

[mappress] Press Release, August 16, 2013; Image: HII

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First forward-deployed Virginia-class sub completes Pacific mission
  2. 2Italian Navy's second next-gen minehunter reaches construction milestone
  3. 3Indian Navy launches seventh ASW SWC at Cochin Shipyard
  4. 4US Navy retires Freedom-variant LCS USS Fort Worth

Related articles

Intermarine
Shipbuilding

Italian Navy's second next-gen minehunter reaches construction milestone

2 days ago

ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

2 days ago

LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

2 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Intermarine
Shipbuilding

Italian Navy's second next-gen minehunter reaches construction milestone

2 days ago
ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

2 days ago
LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

2 days ago