Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Fiscal Uncertainties Delay USS Abraham Lincoln’s Overhaul
Surface Vessels

February 10, 2013 · about 13 years ago

Fiscal Uncertainties Delay USS Abraham Lincoln’s Overhaul

The aircraft carrier USS Abraham Lincoln (CVN 72) refueling complex overhaul (RCOH) will not start due to a lack of funding, the Navy said Feb. 8. Lincoln was expected to move to Newport News shipyard next week to begin the overhaul. However, as a result of the fiscal constraints resulting from the

2 minutes read
  • LinkedIn
  • X
  • Email

The aircraft carrier USS Abraham Lincoln (CVN 72) refueling complex overhaul (RCOH) will not start due to a lack of funding, the Navy said Feb. 8.

Lincoln was expected to move to Newport News shipyard next week to begin the overhaul. However, as a result of the fiscal constraints resulting from the ongoing continuing resolution (CR), the contract for the refueling complex overhaul (RCOH) has not been issued to Huntington Ingalls Industries, Inc.

Lincoln will remain pierside at Naval Station Norfolk until sufficient funding is received to start the execution of the RCOH. In the meantime, the ship’s Sailors continue to conduct maintenance.

In their 50 year life spans, one RCOH is scheduled for the midpoint of an aircraft carrier’s service life. Lincoln was commissioned 23 years ago Nov. 11, 1989.

The impact of postponing CVN 72’s RCOH is three-fold:

* the time scheduled for the RCOH will have to be lengthened because the overhaul won’t begin when it was expected,

* delayed redelivery of Lincoln to the fleet,

* and impacts to industry (takes away money/jobs and can delay subsequent scheduled availabilities).

Cancelling or delaying maintenance creates a significant backlog of deferred maintenance and affects future year schedules and costs, as well as future readiness. The delay in Lincoln’s RCOH will affect other carrier work. Because of the short time available between sequential dockings, the delay will also result in day-for-day impacts to the defueling of the recently inactivated Enterprise (CVN 65) and the start of USS George Washington’s (CVN 73) RCOH.

A yearlong CR impacts funds for fuel, parts, ship and aircraft repairs, base operations, maintenance for buildings, roads and runways, and salaries for our government employees and contractors.

The fiscal uncertainties created by not having an appropriations bill and the measures the Navy is forced to take as a result, place significant stress on an already strained force and undermine the stability of a fragile industrial base.

[mappress] Naval Today Staff, February 11, 2013; Image: US Navy

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAuthoritiesFundingBusiness & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Damen to refit four Royal Bahamas Defence Force vessels
  2. 2OPTICS11 lands Dutch MoD contract for containerized towed array system
  3. 3TKMS and Navantia join hands on submarine projects
  4. 4Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

Related articles

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago