Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Contracts›USA: BAE Systems Signs USD 55 Million Mk 41 VLS Contract
Contracts

June 23, 2011 · about 15 years ago

USA: BAE Systems Signs USD 55 Million Mk 41 VLS Contract

BAE Systems has been awarded a $55 million contract for manufacturing Mk 41 Vertical Launching System (VLS) mechanical components and assemblies. The Mk 41 VLS provides a missile launching system for CG 47 and DDG 51 class surface combatants, and Aegis Ashore requirements for the Missile Defense Age

1 minutes read
  • LinkedIn
  • X
  • Email

BAE Systems has been awarded a $55 million contract for manufacturing Mk 41 Vertical Launching System (VLS) mechanical components and assemblies. The Mk 41 VLS provides a missile launching system for CG 47 and DDG 51 class surface combatants, and Aegis Ashore requirements for the Missile Defense Agency’s Ground Ballistic Missile Defense Program.

The Mk 41 is the primary missile launching system aboard Navy combatants used to store, protect and launch various missiles. BAE Systems and Lockheed Martin are teamed to build the overall VLS.

“BAE Systems’ proven missile launching system will provide offensive and defensive capabilities for current and future naval surface combatants,” said Mark Signorelli , vice president and general manager of weapon systems for BAE Systems. “We look forward to providing our men and women in uniform with the protection they need to patrol waters across the globe safely and efficiently.”

The launchers will be installed in three different Arleigh Burke-class guided missile destroyers –DDG 113, 114 and 115. Each ship will receive two launchers for a total of six. Production on the missile launchers will begin in June 2011 and run through 2013. They will be produced at five different sites, including Aberdeen, S.D.; Aiken, S.C.; York, Pa.; Louisville, Ky.; and Fridley, Minn.

BAE Systems continues to support the U.S. Navy by developing and manufacturing products to enhance performance, safety, and mission success at sea and ashore. [mappress] Source: Baesystems, June 23, 2011;

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ContractsCapital InvestmentsEquipment & technologyVesselsShipbuildingWeapons SystemsSurface VesselsAmphibious & Support ShipsContracts & Tenders

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Iran captured a Dive-LD: what the US Navy underwater drone was built to do
  2. 2Babcock extends Seaspan's support for Canada’s Victoria-class subs
  3. 3Spanish Navy orders MBDA's SIMBAD RC anti-missile systems
  4. 4L3Harris to deliver VAMPIRE counter-unmanned systems to US Navy

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free